This $3 million project that included the repair, widening, and resurfacing of Dunham Road, sewer main and sanitary lateral repairs, and the addition of bike lanes in both directions.
Read MoreCVE is proud to serve as consulting City Engineer for The City of Maple Heights Manhole Sewer Separation Project.
Read MoreAs the Project Lead, Chagrin Valley Engineering (CVE) was responsible for the planning and coordination for the repair a slope failure located on South Woodland Rd
Read MoreThe City of Macedonia is recently constructed and opened a new publicly owned access road connecting the Golden Link shopping center to State Route 8.
Read MoreOur project responsibilities included review of flow data, existing conditions survey, improvement plans and specifications, approvals from the Ohio EPA Dept. of Environmental Finance, project bidding and award recommendation, full construction management including construction observation.
Read MoreThe goal was to create a sustainable environment using green solutions so CVE worked with the manufacturer Presto Geosystems.
Read MoreThis project is a state-of-the-art athletic complex that consists of approximately 175 acres, and is located at the northeast quadrant of I-90 and S.R. 534 in Ashtabula County.
Read MoreThis project includes expansion of and improvement to the existing Synagogue and parking facilities, transforming the campus into a full-service congregational center.
Read MoreThe site is approximately 65 acres, and is located at the northwest quadrant of State Route 8 and Hines Hill Road in Boston Heights, Ohio.
Read MoreThe project provided for the design and construction of a modern “roundabout” at the intersection of Richmond Road and Pettibone Road.
Read MoreThe project consisted of widening and overlaying an existing concrete pavement with a thin layer of asphalt and then constructing a new seven inch thick layer of concrete pavement, a process known as “whitetopping.”
Read MoreApproximately 300 homes in an older section of Pepper Pike was being serviced by existing septic systems. Many of these systems were failing and required substantial upgrades or replacements.
Read MoreThis project required the rehabilitation of an existing pump station that was experiencing frequent operational failures due to system age and poor design.
Read More